RCI Jacking Method
Overwhelmingly low price and short construction period! No need for concrete replacement, allowing for floor raising work without stopping operations.
We would like to introduce our "RCI Jacking Method." Floor construction that would normally take one month if redoing the concrete can be completed in as little as one day. The load-bearing capacity of the concrete increases by 1.5 times, and due to the shorter construction period, costs are reduced to about two-thirds. Please feel free to contact us when you need our services. 【Features】 ■ Short construction period ■ Low cost ■ High quality *For more details, please download the PDF or feel free to contact us.
- 企業:麗和コーポレーション
- 価格:Other